Go directly to
Borescope Inspection
Precise borescope inspection for piping integrity, efficiency and safety.
Foam Testing Service
Trust our foam testing service for superior fire suppression reliability and safety assurance.
July 24, 2017
Our partner Clearwater completed this week another successful overseas SIRON Dry Deluge Testing assignment in Singapore.
In total of 2596 nozzles were tested on 12 deluge systems in 11 days on a new build FPSO / FLNG. Dry Deluge Testing is the only field proven method of efficiently verifying that system pipework and nozzles are clear of blockages and partial blockages without using firewater.
The equipment will be air freighted back this weekend to be turned around for our next 2 scopes in the UK Nuclear Power industry.